TM-9-2320-366-10-1

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 1 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-1 - Page 583 of 802

TM 9-2320-366-10-1
(6) Remove pin (12) from turntable bearing (13) to allow turntable (14) to rotate.
(7) To pre-operational check MHC Overload Shutdown System perform the following:
(a)
Position HOIST lever (1) to UP until hook assembly (3) is against boom nose (15).
(b)
Continue to hold HOIST lever (1) in UP position until hydraulic system is heard to
by-pass.
2-365


Back to Top