TM-9-2320-366-10-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 2 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-2 - Page 358 of 930

TM 9-2320-366-10-2
2-59. FIRE EXTINGUISHER OPERATION (CONT)
f. Fire Extinguisher Installation (M1089).
(1) Install fire extinguisher (1) in clamp (2) with nozzle (3) pointing down.
(2) Push down on latch (4) to secure fire extinguisher (1) in clamp (2).
2-60. HIGHWAY EMERGENCY MARKER KIT SETUP
a. Preparing markers for use:
(1) Position master power switch (1) to on.
(2) Position hazard lights switch (2) to on.
2-732


Back to Top