TM-9-2320-366-20-1

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 1 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-1 - Page 1359 of 1824

TM 9-2320-366-20-1
CONTINUITY TEST
CAUTION
NOTE
Change 1
2-795
(1) Disconnect connector P53R from connector
J53R.
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter
to connector P51 socket 9.
(4) Connect negative (-) probe of multimeter
to connector P53R pin 2 and note
reading on multimeter.
(5) If continuity is not present, repair wire
489T from connector P51 socket 9
to connector P53R pin 2 (para 2-45)
or replace M1083/M1084/M1085/M1090/
M1092/M1093/M1094 rear lights cable
assembly (para 7-84) or M1086/M1088/
M1089 rear lights cable assembly
(para 7-104).
(6) If continuity is present, replace
intervehicular 24 VDC (12 pin) cable
(para 7-129).
(7) Connect connector P53R to connector J53R.
(8) Connect connector P51 to connector J51.
(9) Install PDP on dashboard with three
screws.
(10) Install three washers and screws in PDP.
(11) Install PDP cover (para 16-2).
Inspect connector pins/sockets for damage,
corrosion, and serviceability.
Check that
connector pins are not pushed back and
are capable of making good contact.
Use care when testing electrical connectors.
Do not damage connector pins or sockets
with multimeter probes.
Failure to comply
may result in damage to equipment.


Back to Top