TM-9-2320-366-20-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-2 - Page 540 of 1632

TM 9-2320-366-20-2
TM 9-2320-366-20-2
TM 9-2320-366-20-2
TM 9-2320-366-20-2
TM 9-2320-366-20-2
2-1416
2-1416
2-1416
2-1416
2-1416
NO
YES
YES
3.
Notify DS Maintenance.
Notify DS Maintenance.
Battery voltage OK.
Input voltage to overload
shutdown system OK.
Hydraulic system shutdown
solenoid OK.
Hydraulic system shutdown
relay OK.
Crane functions OK.
Overload lockout cable OK.
Overload shutdown box OK.
Tension load cell OK.
Proximity sensor OK.
Telescope out lockout
solenoid cable OK.
KNOWN INFO
POSSIBLE PROBLEMS
TEST OPTIONS
Continuity Test or
STE/ICE-R #91
REASON FOR QUESTION
Faulty solenoid valve.
Is continuity present across
telescope out lockout
solenoid valve contacts?
Telescope out lockout will
not operate if continuity is
not present across
telescope out lockout
solenoid valve contacts.
e133.
M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE OUT LOCKOUT DOES NOT ACTIVATE
e133.
M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE OUT LOCKOUT DOES NOT ACTIVATE
e133.
M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE OUT LOCKOUT DOES NOT ACTIVATE
e133.
M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE OUT LOCKOUT DOES NOT ACTIVATE
e133.
M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE OUT LOCKOUT DOES NOT ACTIVATE
(CONT)
(CONT)
(CONT)
(CONT)
(CONT)


Back to Top