TM 9-2320-366-20-3
7-14. ELECTRICAL GAGES REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Instrument panel assembly removed for access (para
7-15).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
Materials/Parts
Ties, Cable, Plastic (Item 69, Appendix D)
Nut, Self-Locking (2) (Item 133, Appendix G)
a. Removal.
NOTE
All electrical gages are removed the same
way. Speedometer shown.
(1) Disconnect connector clamp (1) from speedometer
connector (2).
NOTE
Remove plastic cable ties as required.
(2) Disconnect
connector
PX8
(3)
from
speedometer
connector (2).
NOTE
Note
position
of
speedometer
prior
to
removal.
(3) Remove two protective caps (4), self-locking nuts (5),
retaining ring (6), and speedometer (7) from instrument
panel assembly (8). Discard self-locking nuts.
7-91