TM 9-2320-366-20-3
7-17. MAIN LIGHT SWITCH REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Instrument panel assembly removed for access (para
7-15).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
Materials/Parts
Ties, Cable, Plastic (Item 69, Appendix D)
a. Removal.
(1) Remove three screws (1) from knobs (2).
(2) Remove three knobs (2) and spacers (3) from main light
switch (4).
NOTE
Remove plastic cable ties as required.
(3) Disconnect connector PX15 (5) from main light switch
(4).
(4) Remove four screws (6) and main light switch (4) from
instrument panel assembly (7).
7-112