TM 9-2320-366-20-4
Change 2
16-7
16-4.
M1093/M1094 CAB ROOF REPLACEMENT
This task covers:
a.Removal
b.Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Cab clearance lights removed (para 7-38).
Spare tire retainer and davit prepared for air drop (TM 9-
2320-366-10-2).
Tools and Special Tools
Sling Assembly, Air Drop Roof (TM 9-2320-366-10-2).
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Dispenser, Sealant (Item 16.1, Appendix B)
Tools and Special Tools (Cont)
Screwdriver Attachment, Socket Wrench (Item
58, Appendix B)
Screwdriver Attachment, Socket Wrench (Item
49.1, Appendix B)
Material/Parts
Rubber Strip (Item 260, Appendix G)
Sealing Compound (Item 55.2, Appendix D)
Personnel Required
(2)
a. Removal.
(1)
Attach air drop roof sling assembly to cab roof (1).
(2)
Remove four screws (2) and sun visor (3) from cab
roof (1).
WARNING
Cab roof weighs approximately 110 lbs
(50 kgs).
Attach a suitable lifting device
prior to removal.
Failure to comply may
result in injury to personnel.