TM 9-2320-366-20-4
14-5. TAILLIGHT CARRIER REPLACEMENT
This task covers:
a. Left Taillight Carrier Removal
b. Left Taillight Carrier Installation
c. Right Taillight Carrier Removal
d. Right Taillight Carrier Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Composite taillight assembly removed (para 7-39).
Backup light assembly removed (para 7-36).
Marker light assemblies removed (para 7-38).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench Set, Socket (Item 51, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Wrench Set, Socket (Item 49, Appendix C)
Tools and Special Tools (Cont)
Wrench, Torque, 0-600 lb-ft (Item 60, Appendix
C)
Wrench Set, Socket (Item 50, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix
C)
Personnel Required
(2)
a. Left Taillight Carrier Removal.
(1) Remove two self-locking nuts (1), clamps (2), and
screws (3) from left taillight carrier (4).
Discard self-
locking nuts.
(2) Remove two clamps (2) from rear lights cable assembly
(5).
Change 1
14-31