TM-9-2320-366-20-5

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 5 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-5 - Page 585 of 1158

TM 9-2320-366-20-5
20-67. LIGHT MATERIAL HANDLING CRANE (LMHC) CONTROL BOX REPAIR
This task covers:
a. Disassembly
b. Assembly
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
LMHC control box power cable removed (TM 9-2320-
366-10-1).
LMHC control box removed (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Tool Kit, Auto Fuel (Item 43, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 20, Appendix D)
Lockwasher (2) (Item 104, Appendix G)
Lockwasher (4) (Item 115, Appendix G)
Lockwasher (2) (Item 116, Appendix G)
Gasket (Item 27, Appendix G)
Terminal, Lug (2) (Item 279, Appendix G)
a. Disassembly.
(1) Remove eight screws (1), cover (2), and retainer (3) from
NATO plug (4).
NOTE
Tag wires and connection points prior to
disconnecting.
(2) Remove two screws (5), lockwashers (6), and terminal
lugs (7 and 8) from NATO plug (4).
Discard
lockwashers.
(3) Remove terminal lugs (7 and 8) from wires (9 and 10).
Discard terminal lugs.
(4) Remove two grommets (11) from wires (9 and 10).
(5) Remove sleeve (12) from wires (9 and 10).
20-369


Back to Top