TM 9-2320-366-20-5
20-72. M1083/M1093 COLLAPSIBLE DRUMS TIEDOWN KIT INSTALLATION/REMOVAL
This task covers:
a. Installation
b. Removal
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Cargo bed side panels and stakes removed (TM
9-2320-366-10-1).
Tools and Special Tools
Sling, Cargo (Item 31, Appendix C)
Tool Kit, Genl Mech (Item 46, Appendix C)
Tools and Special Tools (Cont)
Wrench, Torque 0-600 lb-ft (Item 60, Appendix C)
Wrench Set, Socket (Item 47, Appendix C)
Materials/Parts
Pin, Cotter (20) (Item 277, Appendix G)
Personnel Required
(2)
WARNING
Ensure vehicle is on level ground prior to
installation of collapsible drums. Failure
to comply may result in serious injury or
death
to
personnel
or
damage
to
equipment.
a. Installation.
NOTE
Front and rear chains are assembled the
same way. One front chain shown.
(1) Position clamp half (1) in hook (2).
(2) Install clamp half (3) on clamp half (1) with spring collar
(4) and pin (5).
20-390