TM 9-2320-366-20-5
Change 2
20-427
20-74.
M1083/M1093 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT
INSTALLATION/REMOVAL
This task covers:
a.
Installation
b.
Removal
c.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Cargo bed side panels and stakes removed (TM 9-2320-
366-10-1).
Tools and Special Tools
Drill Set, Twist (Item 8, Appendix C)
Drill Portable, Electric (Item 7, Appendix C)
Tool Kit, Genl Mech (Item 46, Appendix C)
Sling, Cargo (2) (Item 31, Appendix C)
Tap, Thread, Cutting (Item 41.3, Appendix C)
Tap and Die Set (Item 41.2, Appendix C)
Materials/Parts
Nut, Self-Locking (4) (Item 159, Appendix G)
Lockwasher (24) (Item 73.1, Appendix G)
Personnel Required
(2)
a. Installation.
(1)
Measure and mark a line (1) 1.76 in. (45 mm) from
corner of tiedown bracket (2).
(2)
Measure and mark a line (3) 1.76 in. (45 mm) from
end of tiedown (2).
(3)
Transfer line (4) from line (3), line (1), and to the
side of tiedown bracket (2)
NOTE
Overall height of shelter models A, B, and C
is 83 1/2 to 89 in. (214 to 226 cm).
If shelter
height is less than 83 1/2 in. (214 cm),
shorten cable to remove slack in turnbuckle.
NOTE
Perform steps (1) through (3) on tiedowns
not originally modified.