Change 1
2-707
TM 9-2320-366-34-1
CONTINUITY TEST
(1)
Remove control valve module (para 7-10).
(2)
Remove four screws and cover from
control valve module.
(3)
Disconnect internal wiring harness
connector B from B solenoid.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter
to internal wiring harness 24-pin connector
pin B1.
(6)
Connect negative (-) probe of multimeter
to internal wiring harness connector B
pin A and note reading on multimeter.
(7)
If continuity is not present, replace
transmission internal wiring harness
(para 7-13).
(8)
Connect positive (+) probe of multimeter
to internal wiring harness 24-pin connector
pin B1.
(9)
Connect negative (-) probe of multimeter
to all other pins in internal wiring harness
24-pin connector, except pins B2 and E1,
and note reading on multimeter.
(10)
Connect negative (-) probe of multimeter
to ground and note reading on multimeter.
(11)
If continuity is present, transmission
internal wiring harness is shorted; replace
transmission internal wiring harness
(para 7-13).