TM-9-2320-366-34-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME NO. 2 OF 4

AUGUST 2005
CHANGE 2

  TM-9-2320-366-34-2 - Page 962 of 1434

TM 9-2320-366-34-2
13-302
Change 2
13-30.
M1086 FRAME RAIL REPLACEMENT (CONT)
(21) Install air spring and support bracket (TM 9-2320-366-
20-4).
(22) Install radiator/charge air cooler (TM 9-2320-366-20-3).
(23) Install engine front resilient mount and mounting bracket
(para 3-4).
(24) Install transmission resilient mount and bracket (para 7-
6).
(25) Install air dryer (TM 9-2320-366-20-5).
(26) Install battery box (TM 9-2320-366-20-3).
(27) Install cab to chassis ground strap (TM 9-2320-366-20-3).
(28) Install fuel tank and brackets removed (TM 9-2320-366-20-
3).
(29) Install subframe rail (para 13-39).
(30) Install frame plate (para 13-20).
(31) Install intermediate axle shock absorber brackets (para
14-8).
(32) Install front shock absorber brackets (para 14-7).
(33) Install front spring brackets (para 14-6).
(34) Install stabilizer bracket (para 14-10).
(35) Install front angle brackets (para 13-3).
(36) Install auxiliary oil cooler hoses (TM 9-2320-366-20-4).
(37) Install engine assembly (para 3-3).
(38) Install transmission assembly (para 7-4).
(39) Install cab front support (para 15-3).
(40) Install PTO cable assembly, if equipped (TM 9-2320-366-
20-4).


Back to Top