TM 9-2320-366-34-3
Change 2
16-507
(61) Install two preformed packings (81) on plugs (82).
(62) Position two plugs (82) on upper control valve
assembly (27).
(62.1) Tighten two plugs (82) to 112-123 lb-ft (152-167
N•m)
(62.2) Install preformed packing (82.1) on plug (82.2).
(62.3) Position plug (82.2) in upper control valve
assembly (27).
(62.4)Tighten plug (82.2) to 68-75 lb-ft (92-102 N•m).
e. Installation.
(1) Place upper control valve assembly (1) in control
panel (2).
(2) Connect two air tubes (3) to upper control valve
assembly (1).
(3)
Install upper control valve assembly (1) in control
panel (2) with three bolts (4), six washers (5), and
three nuts (6).