TM-9-2320-366-34-4

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME NO. 4 OF 4

AUGUST 2005
CHANGE 2

  TM-9-2320-366-34-4 - Page 568 of 796

TM 9-2320-366-34-4
D-5. CAB SUPPORT TOOL (CONT)
Figure D-14. Cab Support Tool Assembly
m. Position and clamp cab support tool strut (1) to cab support tool cab rest (2) as shown by dimensions in
Figure
D-14. Cab Support Tool Assembly
, before insulgrip (4) is applied.
n. Weld cab support tool strut (1) to cab support tool cab rest (2).
o. Apply Insulgrip (4) to cab support tool cab rest (2) as described on material container.
D-6. DUMP BED WOODEN BRACE FABRICATION
Cut the wooden braces from bulk wood stock according to the information in the table. Finish as described in the
following steps.
Item
Description
Size or Dimension
Material Description
Qty
Braces
4X4X48in
. (10.1 X 10.1 X 121.9 cm)
4 X 4 in. Lumber (MIL-STD-731)
2
a. All dimensions are in inches (centimeters).
b. Cut 2 of item 1 from MIL-STD 736 Group IV untreated bulk wood stock as indicated in table.
c. Sand and remove sharp edges.
D-20
D-20


Back to Top