4-18.8
Change 1
1.
Install cables (2) and (3) on rear positive terminal (14) of alternator (1) with washer (4),
lockwasher (5), and screw (6), and slide rubber boot (7) over cables (2) and (4).
2.
Install cables (2) and (9) on front positive terminal (8) of alternator (1) with washer (10),
lockwasher (12), and screw (11), and slide rubber boot (13) over cables (2) and (9).
3.
Install cable (21), lead (16), and ground strap (17) on front negative terminal (15) of alternator (1)
with washer (18), lockwasher (20), and screw (19).
4.
Install cables (25) and (21) on rear negative terminal (26) of alternator (1) with washer (24),
lockwasher (23), and screw (22).
TM 9-2320-387-24-1
b. Installation
4-8.2. 400-AMPERE DUAL VOLTAGE ALTERNATOR CABLE REPLACEMENT (Cont’d)