TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 1355 of 1555

TM 9-2320-387-24-2
Sartkn
II_
MAINTENANCE ALLOCATION CHART
Kant’dl
___.
._.
.
.__ _._ __ __-_ _-
-~a
(1)
PI
(3)
(4)
Maintenance level
(5)
(6)
Tools cmd
GWP
Maintenance
Unit
&
e
Depot
Equipment
Remarks
kmber
CW-NAW
Function
C
0
F
H
D
Ref Code
Code
1202
Service
Brakes
Test
0.1
Calipers, Front and Rear
Replace
1.0
1,2,141,151
Repair
0.5
196
Pads, Front and Rear
Inspect
0.2
Replace
1.0
1,2,141
Rotor, Front and Rear
Inspect
0.1
1
Replace
1.2
1,2
Repair
1.5
196
1204
Master Cylinder
Inspect
0.1
Service
0.2
2
Replace
0.5
192
Brake Lines
Inspect
0.2
Replace
1.5
1
Proportioning Valve
Replace
0.6
192
1205
Hydro-Booster
Replace
1.3
132
1206
Pedal, Brake
Replace
1.0
1,2,135,142
13
WHEELS AND TIRES
1301
Front Wheel Toe-In
Align
0.5
1
Rear Wheel Toe-Out
Align
0.5
1
1311
Wheel and Tire Assembly
Inspect
0.1
0.1
Service
0.2
Replace
0.4
0.1
132
N
Repair
0.5
1,2,114
RunfIat Assembly
Replace
2.2
1,2,~5,
J
143
14
STEERING
1401
Mechanical Steering
Wheel, Steering
Replace
0.7
1,2,159
Column
Inspect
0.1
Replace
1.8
192
Intermediate Shaft, Steering
Service
0.2
2
Replace
0.5
192
Tie Rod Assembly
Inspect
0.1
Service
0.2
132
Adjust
0.5
1,2,157
Replace
0.5
1,2,110
Center Link
Inspect
0.1
Replace
0.3
1,2,157
B-12


Back to Top