TM-9-2320-428-10

TRUCK, CARGO, 8X8, M977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-428-10 - Page 902 of 1072

Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
movement of crane. Moving
lever to full travel will cause
faster movement of crane.
b.
Check control levers for
malfunction, proper
response, obvious damage,
missing parts, binding, and
extreme looseness.
Controls
malfunction,
bind, or do
not re-
spond.
c.
Rotate and telescope boom:
WARNING
Ensure area is clear of per-
sonnel prior to moving
SWING lever. Boom should
be swung slowly enough so
crane operator has complete
control. Failure to comply may
result in injury or death to per-
sonnel.
(1) Move SWING control
lever to CW position to
turn boom clockwise.
Boom does
not turn
clockwise.
TM 9-2320-428-10
0148
0148-48


Back to Top