TM-9-2320-428-10

TRUCK, CARGO, 8X8, M977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-428-10 - Page 925 of 1072

Table 1.
PMCS- SEMIANNUAL - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
Figure 10.
3.
Lubricate pivots at both ends of
erection cylinders (eight fittings)
with GAA. (WP 0151, Table 7)
Fitting will
not purge
old lubricant
out of com-
ponent.
TM 9-2320-428-10
0149
0149-17


Back to Top