UNFILTERED BULK UNLOADING - Continued
8.
Connect SR1 and SR2 static cables (4) to equipment receiving fuel and to grounding
devices.
9.
Remove dust cap (5) from C BULK RECEPTACLE (UNFIL) (6).
10.
Open stowage tube cover (7) and remove suction hose (8).
7
8
Figure 16.
11.
Connect one end of suction hose (8) to C BULK RECEPTACLE (UNFIL) (6) and other
end to receiving receptacle.
TM 9-2320-429-10
0089
0089-15