Table 1.
PMCS - DURING - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
L
L
O
N
S
D
E
F
U
E
L
F
U
E
L
OUTIN
VALVE
FLOW METER
80
MARSH
5060
1 010 0
80
10
30
160
140
120
10
0
20
40
60
80
MARSH
5060
1 010 0
80
10
30
160
140
120
10
0
20
40
60
HAV CONTROL
Figure 8.
6. Check HAV air lines, fuel delivery
hoses, valves, fittings,
connectors and piping for leaks,
defects, and obvious damage.
Any fuel
leak is
present
and/or no
other fuel
hoses are
available.
7. Check liquid tank level gauge for
proper operation (WP 0027) and
any obvious damage. Verify level
with measuring stick.
TM 9-2320-429-10