Table 1.
PMCS - BEFORE - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
Inter-vehic-
ular wiring
harness is
missing or
unservicea-
ble.
3. Check operation of work lights.
(WP 0069)
7
Before
Fifth
Wheel
1. Check primary release handle,
linkage, and locking plunger for
damage and proper operation.
(WP 0038)
Mechanism
is damaged
or will not
operate
properly.
PRIMARY
RELEASE HANDLE
SECONDARY
RELEASE HANDLE
Figure 4.
2. Check secondary release handle
linkage and locking plunger for
Mechanism
is damaged
or will not
TM 9-2320-430-10
0126
0126-10