TM-9-2320-431-10-1

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 1 OF 2

JUNE 2009

  TM-9-2320-431-10-1 - Page 1081 of 1244

OPERATOR MAINTENANCE
60-TON TACKLE BLOCK INSTALLATION/REMOVAL
INITIAL SETUP:
Personnel Required
Operator and Assistant - - - (2)
SET UP 60-TON TACKLE BLOCK
NOTE
This procedure is a two soldier task.
1.
Remove handle lock (1) and lock bracket (2).


Back to Top