WINCH MIRED VEHICLE FORWARD - Continued
9
18
17
16
18
19
3
2
4
10
9
M977 SHOWN
Figure 6.
16.
Set PTO ENGAGE switch (2) to OFF position. Indicator light (3) will go out.
17.
Remove quick release pin (16) and guide bracket (17). Move cable guide brackets
(18) apart so cable (9) can be placed against bottom of sheave (19).
18.
Move cable guide brackets (18) together and install guide bracket (17) and quick
release pin (16).
19.
Set PTO ENGAGE switch (2) to ON position. Indicator light (3) will illuminate.
20.
Move winch shift lever (4) to OUT and pay out winch cable (9) while assistant pulls
cable to tree, another heavy vehicle (WP 0117), or another heavy object refer to FM
4-30.31. (Volume 2, WP 0200)
TM 9-2320-431-10-1
0115
0115-6