PREPARE DISABLED VEHICLE
- Continued
28.
Route 8 ft. (2.5 m) utility chain around disabled vehicle cross tube (6) and attach to
recovery vehicle crane load hook (23).
29.
Operate crane controls (WP 0106) to raise load hook (23) until there is slack in the
12 ft. (3.6 m) chain (14).