Table 1.
PMCS - DURING - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
MAST
BOOM
HOOK
MAST
CONTROL LEVER
BOOM
CONTROL LEVER
Figure 19.
(6) Move MAST control
lever to UP position until
the mast is fully erect
and the cylinders are
fully extended. Use
BOOM control lever UP
simultaneously as
required to maintain the
boom at approximately
45° above horizontal
until the mast is fully
erect. Hold the MAST
control lever to UP
position for two to three
seconds after mast is
fully erect to ensure
cylinders are fully filled
with oil.
Mast cylin-
der does not
raise com-
pletely be-
fore stop-
ping.
l.
Rotate and telescope boom;
TM 9-2320-431-10-2
0183
0183-28