TM-9-2320-431-10-2

TRUCK, WRECKER, 8X8, M984A1

TECHNICAL MANUAL; OPERATOR'S MANUAL; PART 2 OF 2

JUNE 2009

  TM-9-2320-431-10-2 - Page 403 of 712

Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
crane was used during mis-
sion.
28
After
Material
Handling
Crane (if
used)
1. Inspect crane for loose nuts and
screws, hydraulic leaks, damage
to hydraulic hoses and lines, and
obvious damage.
Class III
leak or dam-
aged hoses,
lines, or fit-
tings.
NOTE
For more information on ma-
terial handling crane operat-
ing instructions, refer to grove
crane operation (manual con-
trol) procedures. (Volume 1,
WP 0106)
2. Check that crane hydraulic
system is operable as follows:
a. Start engine. (Volume 1,
WP 0044)
b. Set PTO ENGAGE switch to
ON position. PTO indicator
light will illuminate.
TM 9-2320-431-10-2
0184
0184-35


Back to Top