TM-9-2320-433-10

TRUCK, CARGO, GUIDED MISSILE TRANSPORTER (GMT), 8X8, M985E1

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-433-10 - Page 695 of 964

Table 1.
PMCS - BEFORE - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
a. Check gauge for proper
pressure of about 150 psi
(1034 kPa).
Pressure
gauge nee-
dle in RE-
CHARGE
area.
b. Ensure fire extinguisher
mounting is secure.
c.
Check for damaged or
missing seal.
Seal broken
or missing.
WARNING
During normal vehicle
operation, cooling system
can become very hot.
Allow cooling system to
cool prior to servicing.
Failure to comply may
result in injury to
personnel.
Use extreme care when
removing radiator cap.
Sudden release of
pressure can cause a
steam flash. Slowly
loosen radiator cap to the
first stop to relieve
pressure before
removing radiator cap
completely. Failure to
TM 9-2320-433-10
0128
0128-5


Back to Top