Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
frayed, or
broken.
CABLE
HOIST HOOK
Figure 21.
5. Check hoist hook for cracks.
Hook is
cracked.
6. Check operation of crane
hydraulic system by operating
outrigger legs. (WP 0040)
Hydraulic
system
does not op-
erate.
7. Check all hoses, fittings, valves,
and cylinders for signs of leaks
and damage.
Any Class
III leak
present.
END OF WORK PACKAGE
TM 9-2320-433-10
0131
0131-32