TM-9-2320-434-10

TRUCK, LOAD HANDLING SYSTEM (LHS), 8X8, M1120

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-434-10 - Page 1079 of 1324

Table 1.
PMCS - BEFORE - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
18 ft. 2 in. (5.23 m). Failure to
comply may result in injury or
death to personnel.
20
Before
LHS
1. Check for proper operation of
hydraulic selector switch and
joystick control:
TRAILER
AIR SUPPLY
PTO ENGAGE
SWITCH
LHS JOYSTICK
CONTROL
PTO INDICATOR
LIGHT
HYDRAULIC
SELECTOR
SWITCH
LHS
INDICATOR
LHS OVERLOAD
INDICATOR
LHS NO TRANSIT
INDICATOR
Figure 14.
a. Set PTO ENGAGE switch to
ON position. Indicator light
will illuminate.
TM 9-2320-434-10
0157
0157-35


Back to Top