TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 1038 of 1168

Table 1.
PMCS - MONTHLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
Figure 5.
8. Run arctic engine heater for a
minimum of 15 minutes at least
once a month.
TM 9-2320-435-10
0153
0153-8


Back to Top