TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 729 of 1168

OPERATOR MAINTENANCE
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BRIDGE ADAPTER
PALLET (BAP)
INITIAL SETUP:
Personnel Required
Operator and Assistant - - - (2)
PERFORM PROCEDURE
WARNING
Do not attempt to lift a load greater than the rated load capacity of crane
or materiel-handling equipment. Failure to comply may result in injury or
death to personnel and damage to equipment.
NOTE
This procedure is a two soldier task.
Manual mode operations using the cab control box are to be
performed only when the normal AUTO mode electric circuit is
malfunctioning.
This procedure is performed when a loaded BAP must be removed
using a crane or other handling system and must be done with help
of a higher maintenance level.
The BAP weighs 5,810 lbs (2 637 kg). The BAP with bridge bay
weighs 24,148 lbs (10 963 kg).
1.
Ensure main frame is fully stowed.
2.
Ensure that, if necessary, main frame is lowered using loading button of the solenoid
bypass procedure as necessary. (WP 0111)
3.
Secure winch frame to the BAP. and ensure two winch frame locking levers (1) are in
the up position.
////////////////////////////////////////////////////////////////////////////////////
TM 9-2320-435-10
0115
0115-1
////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////


Back to Top