TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 937 of 1168

Table 1.
PMCS - BEFORE - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
22 ft. 2 in. (6.7 m). Failure to
comply may result in injury or
death to personnel.
22
Before
LHS
Controls
1. Check for proper operation of
LHS:
LHS will not
operate.
a. Set PTO ENGAGE switch to
ON position. Indicator light
will illuminate.
PTO
INDICATOR
PTO ENGAGE
SWITCH
LHS OVERLOAD
INDICATOR
LHS ENGAGED
INDICATOR
LHS NO TRANSIT
INDICATOR
JOYSTICK
LHS MODE
SELECT SWITCH
Figure 17.
TM 9-2320-435-10
0148
0148-37


Back to Top