TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 261 of 540

TM 9-2330-326-14&P
H-7
H-2.
10/20 INSPECTION CHECKLIST (Cont.)
2. Lighting, Warning and Safety:
A
R
C
(1) Damaged or hardware missing_______________________________________
___
___
___
(2) Corroded connectors_______________________________________________
___
___
___
(3) Operation _______________________________________________________
___
___
___
3. Main Electrical Harness:
(1) Damaged or hardware missing_______________________________________
___
___
___
(2) Corroded connectors_______________________________________________
___
___
___
4. ABS Sensor Cables, ECU, Modules, Diagnostic Adapter, and Cables:
(1) Damaged or missing hardware or cables _______________________________
___
___
___
(2) Blink code adapter cable and cap damaged or missing _______________________ ___
___
___
(3) Corroded connectors_______________________________________________
___
___
___
(4) Operation _______________________________________________________
___
___
___
5. Hoses, Lines, and Hardware:
a. Hoses and Lines:
(1) Missing or damaged ____________________________________________
___
___
___
(2) Loose or twisted________________________________________________
___
___
___
(3) Evidence of leakage _____________________________________________
___
___
___
6. Stowage Box:
Damage or missing hardware/seal ________________________________
___
___
___
7. Hubodometer:
(1) Presence _____________________________________________________
___
___
___
(2) Damage and missing hardware____________________________________
___
___
___
8. Hubcaps:
Damaged or missing hardware ___________________________________
___
___
___
9. Air tanks, Air Brake Chamber, and ASAs:
(1) Presence _____________________________________________________
___
___
___
(2) Damage or missing/loose hardware ________________________________
___
___
___
(3) Operation _____________________________________________________
___
___
___
(4) Moisture drained from air tanks _________________________________________________
___
___
___


Back to Top