TM-9-2330-328-14-P

CHASSIS, CONTAINERIZED KITCHEN TRAILER: 7 1/2-TON, 4-WHEEL XCK2000 AND XCK2000E1

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

DECEMBER 2001

  TM-9-2330-328-14-P - Page 148 of 254

TM 9-2330-328-14&P
AXLE - Continued
0019 00
f. Assembly.
(1) Install camshafts and bearings (WP 0016 00-9), slack adjusters (WP 0016 00-11)
and brakes (WP 0016 00-7).
(2) Install hubs and drums (WP 0016 00-1).
(3) Install air brake chambers (WP 0016 00-13).
(4) Install wheels and tires (WP 0012 00-3).
g. Installation.
(1) Install springs on axle (WP 0018 00-1).
(2) Roll axle assembly with wheels and suspension underneath trailer. Position unit
underneath suspension hangers.
(3) Install spring rollers and torque arms (WP 0018 00-1).
(4) Lower trailer.
(5) Connect air hoses to air brake chambers.
(6) Close drain cocks on air tanks.
(7) Uncage brakes (WP 0006 00-3).
(8) Adjust air brake chamber (WP 0016 00-13).
(9) Adjust brakes (WP 0016 00-10).
0019 00-2
2
1


Back to Top