TM-9-2330-328-14-P

CHASSIS, CONTAINERIZED KITCHEN TRAILER: 7 1/2-TON, 4-WHEEL XCK2000 AND XCK2000E1

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

DECEMBER 2001

  TM-9-2330-328-14-P - Page 37 of 254

PREPARATION FOR USE
Perform the operator/crew preventive maintenance checks and services in the Before (B) column
before continuing with the following procedures.
All persons not involved in coupling operation must stand clear of towing vehicle and
trailer to prevent possible injury.
1.
Review and perform towing vehicle operating procedures to prepare towing vehicle for coupling.
0005 00-1
Change 1
TM 9-2330-328-14&P
OPERATION UNDER USUAL CONDITIONS
0005 00
NOTE
Use an assistant to direct you while backing up.
2.
Align towing vehicle with trailer.
3.
Slowly back towing vehicle until lunette
(1)
and pintle
(2)
engage.
Close pintle.
4.
Install pintle lockpin
(3)
.


Back to Top