TM 9-2330-330-14&P
0056 00-1
BATTERY AND BATTERY CABLES REPLACEMENT
0056 00
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic’s (item 4, WP 0171 00)
Materials/Parts Equipment
Conditions
Self-locking nuts (2) (item 77, WP 0175 00)
Semitrailer disconnected from prime mover (refer
to WP 0007 00)
NATO slave receptacle removed (refer to
WP 0064 00)
Semitrailer grounded (refer to WP 0007 00)
Remove battery access panel (refer to
WP 0055 00)
REMOVAL
1.
Remove two self-locking nuts (1), washers (2), and battery cover (3). Discard self-locking nuts.