TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 487 of 1116

TM 9-2330-330-14&P
0111 00-1
ENGINE FAN SHROUD AND INTAKE AIR CLEANER REPLACEMENT
0111 00
THIS WP COVERS:
Removal, Installation, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic’s (item 4, WP 0171 00)
Materials/Parts Equipment
Conditions
Self-locking nuts (9) (item 88, WP 0175 00)
Self-locking nuts (4) (item 92, WP 0175 00)
Semitrailer disconnected from prime mover (refer
to
WP 0007 00)
Fuel tank removed (refer to WP 0108 00)
References
WP 0039 00
Semitrailer grounded (refer to WP 0007 00)
Curbside optic socket box bracket removed from
fan shroud (refer to WP 0050 00)
Air restriction indicator removed (refer to
WP 0112 00)
ENGINE FAN SHROUD AND INTAKE AIR CLEANER REPLACEMENT
0111 00


Back to Top