TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 699 of 1116

TM 9-2330-330-14&P
0158 00-9
ENGINE AND PUMP CABINET FRAME REPLACEMENT—Continued
0158 00
22.
Remove four self-locking nuts (84), eight washers (85), and four bolts (86) from inside vertical
support (87). Discard self-locking nuts.
23.
Remove two self-locking nuts (88), four washers (89), two bolts (90), and front inside vertical
support (87) from semitrailer tank rib (83). Discard self-locking nuts.
24.
Using a forklift, lower engine frame.
25.
Separate engine and pump from frame.
26.
Remove damaged components from engine frame and discard self-locking nuts.
NOTE
Engine frame is bolted together.
Loosely assemble frame
Components on a flat surface.
Tighten fasteners on cross
members last.


Back to Top