TM-9-2330-331-14-P

SEMITRAILER, FLATBED: BREAKBULK/CONTAINER TRANSPORTER, 34 TON, M872A4

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TM-9-2330-331-14-P - Page 171 of 472

TM 9-2330-331-14&P
0030 00
CLEARANCE LIGHTS REPLACEMENT-Continued
INSTALLATION
1.
Apply antiseize compound to four new self-tapping screws (4). Install clearance light mount (5) and
four new self-tapping screws (4).
2.
Apply dielectric grease to wiring harness pins. Connect wiring harness connector to clearance
light bulb (3).
3. Secure clearance light bulb (3) in mount (5) by turning one quarter turn clockwise.
4. Attach clearance light cover (2) using two screws (1).
FOLLOW-ON TASKS
• Connect towing vehicle electrical connector to semitrailer.
• Check operation of light.
END OF WORK PACKAGE
0030 00-3/4 Blank


Back to Top