TM 9-2330-331-14&P
0045 00
AIR RESERVOIRS REPLACEMENT - Continued
FOLLOW-ON TASKS
•
Install spring valve (WP 0043 00-3).
•
Connect semitrailer to prime mover.
•
Remove tire chocks.
•
Raise landing legs.
•
Remove/store ground boards.
•
Pressurize system.
•
Check for air leaks (WP 0044 00-1).
•
Verify proper/safe operation.
END OF WORK PACKAGE
0045 00-3/4 Blank