TM 9-2330-334-13&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INCLUDING LUBRICATION INSTRUCTIONS - Continued
0052 00
0052 00-23
Change 1
After
PMCS Procedures for Trailer - Continued
Table 7.
Preventive Maintenance Checks and Services (PMCS) - After.
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED
OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
1
After
Air Tanks
1. With trailer parked and towing
vehicle engine shut down, listen for
sound of air leaks around trailer air
tanks (1).
Air leak(s)
heard around
air tanks.
2. Open air tank drain valves (2)
and drain moisture (WP 0004 00,
Draining Air Tanks).