TM 9-2350-238-20- 2
7
Install hydraulic differential pressur e
12
Install tube nipple (27), new preforme d
switch (16), four machine screws (17) ,
packing (28), and plain hexagon nu t
four new Iockwashers (18), and fou r
(29) .
hexagon plain nuts (19) on bracket (20) .
13
Install and connect pressure switch meta l
8
Install new preformed packing (21) an d
tube assembly (30) on both ends on tw o
tube nipple (22) on hydraulic differentia l
tube nipples (26 and 27) .
pressure switch (16) .
14
Connect two electrical leads (31) o n
9
Install pipe straight adapter (23) .
hydraulic differential pressure switc h
(16) .
10
Install and connect pressure switch meta l
tube assembly (24) on tube nipple (22 )
15
Install reservoir drain ball valve (32) .
and pipe straight adapter (23) .
16
Install drain valve quick coupling hal f
11
Install new preformed packing (25) an d
(33) on reservoir drain ball valve (32) .
tube nippIe (26) on hydraulic differentia l
pressure switch (16) .
2-23 1