TM 9-2350-256-20-2
0204 00
13.
Connect connector (1) to rigger’s service light switch (24).
14.
Install 11 clamps (21) using screw (22) and lockwasher (23) for each.
NOTE
Follow-on maintenance: Install switch panel (see WP 0159 00); Install gage panel (see WP 0157 00).
END OF WORK PACKAGE
0204 00-10