TM 9-2350-274-BD
ARMAMENT AND FIRE CONTROL SYSTE M
10-15. TRAVERSING MECHANISM DAMAGE (Cent).
Option Four:
Personnel/Time Required:
●
soldiers
●
minutes
Material/Tools:
●
Rope, common wire or other suitable material
●
Procedural Steps:
1. Remove three screws (1) at the base of traversing differential assembly.
2. Two men are required to lift-up traversing assembly from deck of vehicle.
3. Remove one screw (2), washer (3) and nut (4) from traversing final drive housing.
4. Remove six screws (5) from final drive retainer plates and drop down traversing final drive in cannon
weld.
Change 1
10-21