TM-9-2350-274-BD

M109/M110/M578 VEHICLES HOWITZER, MEDIUM, SELF-PROPELLED FULL-TRACKED

TECHNICAL MANUAL; OPERATORS, ORGANIZATIONAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

JANUARY 1984

  TM-9-2350-274-BD - Page 30 of 219

TM 9-2350-274-BD
ASSESSING BATTLEFIELD DAMAGE
(2) Appendix B lists special or fabricated tools used in performing BDAR
repairs,
(3) Appendix C lists substitutes for the petroleum, oil, and lubricants (POL).
2-5. Assessment Process.
a. The assessment procedures are structured using the logic process shown in
figure 2-1 below,
Figure 2-1. Battlefield Damage Assessment Process.
2-4


Back to Top