TM-9-2350-277-10

CARRIER, M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; OPERATOR’S MANUAL

  TM-9-2350-277-10 - Page 633 of 889

TM 9-2350-277-10
PREVENTIVE MAINTENANCE CHECKS AND SERVICES — Continued
0090 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
2)
Clean debris from barrel drain holes by
inserting stiff wire, if necessary.
3)
Be sure that no residue remains around
tip plugs located at bottom center in
each barrel.
4)
Immediately after firing and for two
consecutive days thereafter, thoroughly
clean tubes with cleaning compound
(WP 0104 00, Item 5). Make sure all
surfaces are well coated. Do not wipe
dry.
5)
Three days after last firing, clean tubes
with cleaning compound (WP 0104 00,
Item 5). Wipe dry with clean cloth
(WP 0104 00, Item 7).
d.
Covering Launchers.
1)
After each cleaning, install rubber
covers on launcher tubes.
0090 00-78
Change 5


Back to Top