TM-9-2350-277-20-2

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 2 OF 6

  TM-9-2350-277-20-2 - Page 20 of 783

TM 9-2350-277-20-2
SERVICE UPON RECEIPT
0154 00
THIS WORK PACKAGE COVERS:
This section contains information on how to check the M58, M113A3, M577A3, M1059A3,
M1064A3, and M1068A3 carriers when received.
INITIAL SETUP:
Maintenance Level
Unit
PRELIMINARY CHECKS AND ADJUSTMENTS
CHECKING UNPACKED EQUIPMENT
1.
Do the following steps to check carriers and parts upon receipt:
a.
Inspect the equipment for possible damage incurred during shipment. If the equipment has been damaged, report
the damage on DD Form 6, Packaging Improvement Report.
b.
Check equipment against the packing slip and the BII in TM 9-2350-277-10 (All Carriers), to see if shipment is
complete. Report all differences using the procedure given in DA Pamphlet 738-750.
c.
Check to see whether the equipment has been modified. See DA Form 2408–9, Transfer, Gain, and Loss Report.
END OF TASK
0154 00-1/2 blank
Change 2


Back to Top