TM-9-2350-277-20-3

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 3 OF 6

  TM-9-2350-277-20-3 - Page 274 of 941

TM 9-2350-277-20-3
REPLACE FRONT DOME LIGHT SWITCH (M577A3 AND M1068A3 ONLY) — Continued
0314 00
INSTALLATION
1.
Install front dome switch (10) in master switch panel (4). Secure with two screws (9).
2.
Connect circuit 10 lead (8), circuit 38A lead (7), and circuit 38 lead (6) to front dome light switch (10).
3.
Install master switch panel (4) on distribution box (5). Secure with eight screws (3), washers (2), and new locknuts (1).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0338 00).
2.
Turn MASTER SWITCH ON (see your -10).
3.
Turn on front dome light switch to check that switch is operable (see your -10). Dome light should come on.
4.
Turn all switches OFF (see your -10).
END OF TASK
0314 00-3/4 blank


Back to Top