TM 9-2350-277-20-3
ADJUST TRANSMISSION BRAKES — Continued
0394 00
4.
Check transmission brake adjustment (WP 0406 00).
5.
Repeat Steps 3 - 4 as needed until indicator stops at APPLY mark at specified torque.
6.
Install new gasket (2) and cover (3) on transmission (4). Secure with six washers (5) and self-locking bolts (6).
TORQUE BOLTS (3) TO 156-180 LB-IN. (18-20 N·m). Use torque wrench.
7.
Connect hose (7) to elbow (8).
FOLLOW-THROUGH STEPS
1.
Install power plant (if removed) (WP 0156 00).
2.
Close power plant access door. See TM 9-2350-277-10.
3.
Install hull front access cover panel (WP 0449 00).
END OF TASK
0394 00-7/8 blank
Change 5